Customer Service 866-417-8563 Monday - Saturday 8am - 5pm Eastern Time      
International Shipping available for most products.
 
Shipping and Payment Details
Contact Us
Search
Home
Privacy

Asphalt Tools Brushs, Brooms and Handles Cargo Tie Downs-Ratchet Straps Concrete Tools Demolition Hammer Bits Diamond Blades & Core Bits Drywall, Plaster and Stucco Tools Electrical, Cable and Data Tools Fall Protection Fencing Tools Flooring Tools Hand Tools Hoist, Jacks and Come-Alongs Industrial Hose, Fittings, and Acc. Iron Workers and Rebar Tools Landscaping Tools Masonry Tools Measuring and Marking Parts Department Portable Heaters Roofing Tools Safety Equipment and Supplies Siding, Sheet Metal and HVAC Tool Bags, Belts and Work Gear Water Pumps and Generators Work Gloves & Slush Boots Clearance and Closeouts  
Home > Parts Department > Portable Heater Parts




Kerosene Heater Pump Kit 5/8" Thick Rotor

 
Kerosene Heater Pump Kit 5/8" Thick Rotor
Click Image to Zoom



    Quantity in Basket: None
    Code: T6998
    Price: $17.59
     
     
      Quantity:
     

    Original Equipment Ready Heater Parts

    Pump Rotor Kit HA3005
    Includes Instructions
    Includes Ready Heater Part #M22456-2 Rotor, M8643-2 Blades and M22009 Rotor Insert
    This filter kit also fits many other heaters from 35,000 BTU thru 150,000 BTU including Ready Heaters, Master, Desa, Knipc, Remington, Sears Heaters, Dayton Heaters, Co-Op Heaters, Dart Heaters, Cenex Heaters and more.
    There are 2 rotor kits avaliable 5/8" and 1/2": Measure the thickness of the rotor
    Low Pressure Kerosene Heater Rotor Installation Instructions

    1. Remove upper shell
    2. Remove filter end cover crews using a 5/16" nut driver and remove the end cover and filters.
    3. Remove pump plate screws and pum plate.
    4. Remove the rotor insert and blades.
    5. Clean pump housing thoroughly before installing new rotor.
    6. Check the gap on rotor. Adjust to .003 to .004 if needed.
    7. Assemble unit and adjust pump pressure.

    Note: If after assemble the rotor is binding. disassemble unit and place fine sandpaper (600grit) on a flat surface. Sand rotor lightly in a figure 8 motion 4 times and reassemble.
    Correct Pump Pressure is crucial for your heater to run properly


    Related Item(s)
    Code Name Image Price Availability  
    T12367 Kerosene Heater Low Pressure Test Gauge $21.59  
     


    See our Complete Line of Portable Heaters by Heat Star and DeWalt


     




    You may also like these quality name brand tools.
    Concrete Finishing Tools

    You may also like these quality name brand tools.

    Diamond Tools

    Saws, Cutters, Flooring Tools

    Shovels, Rakes, Picks,
    Sledge Hammers

    Drywall, Stucco, Plaster Tools

    Tools Bags, Belts, Organizers




    You may also Like.

    Hand Tools